CAF has manufactured 14 metro units that run on the first Alger metro line that joins Haï el Badr and Tafourah Grande Poste. The trains are made up of 6 cars each and passengers can move along the train through unobstructed gangways.

In addition to supplying the rolling stock to Entreprise du Métro d´Alger, CAF has been commissioned with the full fitting out of maintenance workshops, the supply of auxiliary vehicles and the performance of train maintenance.

Other Projects

Technical data sheet

  • Composition Tc-M-M-M-M-Tc
  • Train length (mm): 107.980
  • Total passenger capacity 1.290 (6p/m2)
  • Maximum speed (km/h) 72
  • Equipment
    • Event recorder
    • Audio and visual information for passengers
    • Public Address System
    • Line exterior and train number signs.
    • Intercoms associated to alarm handles, one per passenger door.
    • ATP CBTC equipment
    • Gangway
    • Full duplex TETRA train-ground radio equipment
    • Train and diagnostics control system by means of programmed logic