Refurbishment and upgrading

METRO LYON LINE D

  • Project: METRO LYON LINE D
  • Flota: 36 2-car units.
  • Segment: Metro
  • Structure Mc-Mc
  • Customer SYTRAL, Sindicat Mixte des Transport pour le Rhône et l´Agglomération Lyonnaise
  • Scope of refurbishment:
    • - Aluminium carbody repairs.
    • - Cab paintwork refurbishment.
    • - Door refurbishment.
    • - Pneumatic pipe cleaning.
    • - Flooring laying.
    • - LV circuit and auxiliary energy.

MC: motor car with cab M: motor car without cab T: trailer car PT: trailer car with automatic piloting.