ZARAGOZA STREETCAR

Construction of the first streetcar line in Zaragoza, Spain. CAF is responsible for the electrification system, supply of streetcars, maintenance and workshop equipment. Extension of 12.8 km of line 1, a stretch of 2.2 km is without catenary.

Rolling stock and maintenance

  • The supply of 21 Urbos streetcars with an ACR system.
  • Rolling stock maintenance.
  • Equipping the workshops.

Energy and Electrification

  • The complete electrification of the system, including: 5 traction sub-stations, 6 power switching systems (for the catenary-free sections) and 2c10 kV power supply networks.