In 2009, CAF was awarded the production of 7 tram-trains for the new Cadiz Tram-train system. This system consists of a total length of 24 km and will connect Chiclana, San Fernando and Cadiz. They are 55% low floor and consist of 3 modules each.
Other Projects
Technical data sheet
CompositionMc-T-Mc
Train length (mm):38,140
TOTAL PASSENGER CAPACITY287 (8p/m2)
Maximum speed (km/h)100
Equipment
Signalling: ASFA + CASE
Control and diagnosis system (MVB)
Analogue radio telephone
PIS + CCTV (front destination indicators + 4 interior cameras per car)