PARRAMATTA TRAMWAY

Supply, operation and maintenance of the Parramatta Light Rail Project (Stage 1), as part of the Great River City Light Rail consortium

Rolling stock

  • Supply of 13 Urbos LRV composed of 7 modules equipped with Greentech Freedrive.

Signalling

  • Signalling system and communications.
  • Communications and control centre.

ENERGY

  • Substations, SCADA and charging point in one end of the line.

Civil works

  • Design and construction of maintenance depots.
  • Design and construction of 16 stations.
  • Catenary installation.

OPERATION

  • Operation and maintenance of the system as part of the Great River City Light Rail consortium for a term of 8 years.